The light at the end of tunnel…

We are getting closer and closer to finishing the bus!  The kitchen is close to completion, missing a few essentials, like plumbing and a propane connection!  Coming soon…

 

The other project I’ve been working on is the girls’ beds – we thought about bunk beds for awhile, but decided it would make their room feel even smaller than it is, and block too much light.  So, instead of that we are going with a trundle bed, but with built-in drawers beneath each bed.  Here are a few pictures of the frames with one of the drawers.  Still have one last drawer to make and install, and drawer fronts to put on, but this is where we are now.

 

The bus progress is coming along, and after a couple years of this project going on, we have a real deadline – we put our house on the market to sell, and it’s currently in escrow.  Unless something comes up to change the deal, we’ll be moving out of our house by May 15th!  IMG_2462

 

The Bell Rings

A poem coming to you from Witless Wanderings of Nibbling Sheep.

Witless Wanderings of Nibbling Sheep

img_2785

Sitting. Still. Mind wandering.

Thoughts come and go, space in-between.

Adjusting form, swishing cloth. A cough.

Stomach gurgling, like a trumpeting crane.

Spine straight, thumbs lightly touching.

Tires crunching gravel, muffled radio from within.

A raven croaks, “Good morning.

I am here. I am awake.”

I am all of this, suchness.

It is all me, ephemera.

Narrow chasms open to wide spaces.

The bell rings and I bow.

View original post