The Advent of Electricity – almost there!

After a long hiatus, mostly due to my own mental stumblings over working with electricity, work on the bus has begun rolling forward again, and I feel my motivation and enthusiasm building.  Hard to say if that feeling comes from getting over the mental roadblock or is more to do with the changing weather – I tend to be much more motivated on a sunny day!  So with the sunshine comes progress on the bus.  While figuring out how to begin the electrical installation, I worked on a couple of the built-in shelves   – one behind the driver’s seat, and another that forms part of the wall between the girls room and the rest of the bus.  They are not 100% finished, but here are the bare bones:

IMG_6317IMG_6318

IMG_6316IMG_6315

While I figured out our electrical diagram, I started working on the boards that will cover up the wires, make the bus a little “prettier”, and also to make extra shelving possible that will nearly encircle the bus.  We are running the wiring (12 gauge, the kind in the bendy conduit) above the windows, and the outlets and switches will be attached to a 12″ cedar board that will be attached to the bus walls.

IMG_6676

Our vision for the wiring is to set up a simple system that can be plugged into the grid with an extension cord or be upgraded to solar when/if the need arises.  We are building in storage for the batteries, converter, charger, etc., that will be in the same area where the extension cord will come into the bus.

I find that each task seems fairly simple and straightforward, but then I realize that working on these things with two small kiddos in tow can really stretch out the amount of time needed.  It’s taken me weeks to get boards sanded, cut just right, attach the shelves, and build little boxes that will house the outlets.  But as of today, I have half of the boards ready, and I’m excited to get them up on the walls and have outlet boxes with wires coming through!!  Here’s a photo of the board while it’s laying on the floor of the bus.

IMG_6680

And here’s a photo of one of the outlet boxes – kindof confusing to see while laying on the floor, but hopefully soon it’ll be on the wall and more obvious how the outlet will fit.

IMG_6678

The final thing that I’ve been finishing up is the baseboards!  Hooray!  No more gap around the edge of the bus!  We used the same redwood paneling we had for the walls, just cut at an angle.

IMG_6666

 

Those are the updates – now I can hope for more sunshine so I can be outside sanding, sawing, and varnishing!


Written by Kristin

5 thoughts on “The Advent of Electricity – almost there!

  1. Chris

    The bus looks fantastic, you’ve made excellent progress. I’m constantly inspired by how dedicated you and Dave are to live your values- simplicity, sustainability, adventure, family, and friends. The bus is so much more than just a bus.

    Like

  2. Casey

    Wow! It’s beautiful. Really nice work. I’m very impressed. It really shows you guys have taken your time and put a lot of thought into something your family will enjoy for many many years.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s